LAMBERTS CABLE SPLICING COMPANY LLC

Other led · Cape Coral · active Aug 2026

New entrant

Permits

26

on file

Total value

$0.0

where published

Median value

$0

per permit

Top trade

Other

most filings

Top city

Cape Coral

most filings

Active span

Aug 2026

new entrant

Stage mix

by lifecycle
Issued19
Finaled6
Expired1

Trade mix

by permit
Other26

Where they work

12 located permits
Colour by

Lifecycle stage

  • Applied
  • In Review
  • Issued
  • Inspections
  • Finaled
  • Expired
  • Voided
  • Unknown

Recent filings

latest 26 by last seen
PermitSourceCityTradeDescriptionAddressValueApplicantStatusIssued
ROW25-000288Newcape-coral-flCape Coral33993OtherRight of Way - Utility InstallationStarting at MST on N side of NW 6th Street using 1.25 -2 HDPE for all bores. Trenching S for 60( boring under NW 6th Street) exiting ROW to customer premise2758 NW 6TH ST$0·Closed2025-12-01·
ROW26-000003Newcape-coral-flCape Coral33991OtherRight of Way - Utility InstallationStarting at MST on N side of SW 15th Street using 1.25 -2 HDPE for all bores. Trenching S for 62 ( boring under SW 15th Street) Trenching E and S for approx. 200 to Hand hole.1506 CHIQUITA BLVD S$0·Closed2026-02-24·
ROW25-000227Newcape-coral-flCape Coral33991OtherRight of Way - Utility Installation·1 EL DORADO BLVD S$0·Issued2025-09-18·
ROW25-000226Newcape-coral-flCape CoralOtherRight of Way - Utility Installation·3211 CEITUS PKWY$0·Issued2025-09-18·
ROW25-000221Newcape-coral-flCape CoralOtherRight of Way - Utility InstallationTHIS ATC ORDER, P.324563, WILL BURY 2 EXISTING SPLICE PEDESTALS IN THE F/O 2036 DENAVARRA PKWY. COPPER SPLICES WILL BE BURIED TO BE OUT OF CONFLICT WITH PROPOSED CONSTRUCTION. THE EXISTING BROKEN HH# 207732 WILL BE REPLACED AND LEVELED TO NEW SIDEWALK.2036 DE NAVARRA PKWY$0·Issued2025-09-12·
ROW26-000025Newcape-coral-flCape Coral33914OtherRight of Way - Utility InstallationStarting at MST on N side of SW 57th Street using 1.25 -2 HDPE for all bores. Trenching S for 60 ( boring under sidewalks and SW 57th Street) exiting ROW to customer premise.1074 SW 57TH ST$0·Closed2026-01-30·
ROW25-000140Newcape-coral-flCape CoralOtherRight of Way - Utility Installation6563THIS ORDER, P.298864, WILL PROVIDE FIBER TO 1523 NE PINE ISLAND RD.-UNIT 120. FROM EXISTING HH# A4KS3, WE WILL LEAVE A 60' COIL OF 48F, WE WILL BORE APPROX. 500' TO PED# 200512. WE WILL LOCATE THE CUSTOMERS ENTRANCE CONDUIT AND PLACE NEW HH ON TOP OF1523 PINE ISLAND RD NE$0·Issued2025-05-22·
ROW25-000259Newcape-coral-flCape Coral33914OtherRight of Way - Utility InstallationTHIS ORDER, P.323752, WILL PROVIDE FIBER TO VZW SMALL CELL SITE AT 3211 SURFSIDE. FROM EXISTING HH# A27QR WE WILL LEAVE A 60' COIL OF 24F, THEN HAND DIG APPROX. 6' TO BASE OF POLE. WE WILL GO UP POLE AND OVERLASH EXISTING FIBER ACROSS SURFSIDE BLVD. FOR A2909 GLEASON PKWY$0·Issued2026-01-09·
ROW26-000147Newcape-coral-flCape Coral33904OtherRight of Way - Utility InstallationStarting at MST on W side of SE 27th Terrace using 1.25 -2 HDPE for all bores. Trenching SE for 49 ( boring under SE 27th Terrace) exiting ROW to customer premise2063 SE 27TH TER$0·Issued2026-07-17·
ROW26-000138Newcape-coral-flCape Coral33991OtherRight of Way - Utility InstallationStarting at MST on E side of SW 24th Court using 1.25 -2 HDPE for all bores. Trenching W for 58 (boring under SW 24th Court) exiting ROW to Customer premise353 EL DORADO BLVD S$0·Issued2026-07-07·
ROW26-000111Newcape-coral-flCape Coral33904OtherRight of Way - Utility InstallationStarting at MST on W side of SE 35th Street using 1.25 -2 HDPE for all bores. Trenching E for 52 ( boring under SE 35th St) exiting ROW to customer premise.1951 SE 35TH ST$0·Issued2026-06-05·
ROW26-000023Newcape-coral-flCape Coral33991OtherRight of Way - Utility InstallationStarting at MST on S side of SW 2nd Street using 1.25 -2 HDPE for all bores. Trenching N for 62 ( boring under SW 2nd Street) exiting ROW to customer premise1811 SW 2ND ST$0·Closed2026-01-29·
ROW25-000228Newcape-coral-flCape Coral33990OtherRight of Way - Utility Installation·812 DEL PRADO BLVD S$0·Issued2025-09-25·
ROW26-000075Newcape-coral-flCape Coral33909OtherRight of Way - Utility InstallationThis project requires the location and adjustment of copper, fiber and pedestals during construction to preserve current connectivity and services along the ROWS of Diplomat Parkway & Andalusia Rd.1547 ANDALUSIA BLVD$0·Issued2026-05-27·
ROW25-000225Newcape-coral-flCape Coral33993OtherRight of Way - Utility Installation·2425 EMBERS PKWY W$0·Issued2025-09-18·
ROW26-000136Newcape-coral-flCape Coral33993OtherRight of Way - Utility InstallationDoing a small coordinate & adjust for a drainage culvert.1835 EMBERS PKWY W$0·Issued2026-07-14·
ROW25-000306Newcape-coral-flCape Coral33993OtherRight of Way - Utility InstallationStarting at MST on E side of NW 9th Place using 1.25 -2 HDPE for all bores. Trenching W for 60 ( boring under NW 9th Place) exiting ROW to customer premise1406 NW 9TH PL$0·Closed2025-12-31·
ROW25-000260Newcape-coral-flCape Coral33914OtherRight of Way - Utility InstallationTHIS ORDER, P.323746, WILL PROVIDE FIBER TO VZW SMALL CELL SITE AT 1046 ROSE GARDEN RD. FROM EXISTING HH# 235597 WE WILL HAND DIG APPROX. 40' TO VZW CABINET. WE WILL PLACE A 12 PORT OPP IN VZW CABINET. FROM VZW CABINET WE WILL RUN THE 12F PRE CONNECTORIZE1045 ROSE GARDEN RD$0·Issued2025-10-30·
ROW26-000118Newcape-coral-flCape Coral33993OtherRight of Way - Utility InstallationCenturyLink needs to adjust underground telco for traffic signal and roadway improvement design for Chiquita Blvd and Embers PKWY W1600 EMBERS PKWY W$0·Issued2026-06-24·
ROW26-000020Newcape-coral-flCape Coral33990OtherRight of Way - Utility InstallationStarting at MST on S side of SE 12th Terrace using 1.25 -2 HDPE for all bores. Trenching E for 9 turning N for 48 ( boring under SE 12th Terrace) exiting ROW to customer premise.1219 SE 12TH TER$0·Issued2026-02-05·
ROW26-000113Newcape-coral-flCape Coral33993OtherRight of Way - Utility InstallationStarting at MST on S side of NW 6th Street using 1.25 -2 HDPE for all bores. Trenching N for 56( boring under NW 6th Street) exiting ROW to customer premise.2023 NW 6TH ST$0·Closed2026-06-05·
ROW26-000127Newcape-coral-flCape Coral33909OtherRight of Way - Utility InstallationStarting at MST on E side of NE 9th Place using 1.25 -2 HDPE for all bores. Trenching W for 60 ( boring under NE 9th Place) exiting ROW to customer premise.3614 NE 9TH PL$0·Issued2026-06-24·
ROW25-000171Newcape-coral-flCape Coral33909OtherRight of Way - Utility InstallationTHIS DAMAGE CLAIM WORK ORDER, P.327544, WILL PROVIDE REPLACE A DAMAGED SECTION OF 144F. FROM EXISTING HH#221242 WE WILL LEAVE A 60' COIL OF 144F THEN WE WILL TRECH AND BORE FOR APPROX. 580' AND PLACE A NEW HH. WE WILL TRENCH PASS HH# 222491 WHICH WE WILL1290 DEL PINE DR$0·Issued2025-07-08·
ROW25-000302Newcape-coral-flCape Coral33904OtherRight of Way - Utility Installation·1950 BEACH PKWY$0·Issued2026-01-30·
ROW25-000233Newcape-coral-flCape CoralOtherRight of Way - Utility InstallationThis project requires the location and adjustment of copper & fiber cables during construction to preserve current connectivity & service. The work will require replacement of new 5168 of fiber, new hand holes and pedestals and removals of existing fiber2328 HANCOCK BRIDGE PKWY$0·Issued2025-10-16·
ROW25-000224Newcape-coral-flCape Coral33993OtherRight of Way - Utility Installation·3227 EMBERS PKWY W$0·Expired2025-12-01·